NextEra Energy

N Rad Prot Technician- SC- Temporary

Posted on: 27 Mar 2021

Florida City, FL

Job Description

Position Specific Description

NextEra Energy at Plant Turkey Point is now hiring Temporary Radiation Protection Technicians to provide necessary support for the ISFSI project, begininng March 2021- September 30th 2021.

Qualified professionals must hold ANSI 18.1- 3.1 certification. Weekly Per Diem provided.

Job Overview

Minimum requirements for job:

* An ANSI qualified health physics technician shall have a minimum of 6000 hours (PSL) or 5000 hours (PTN) of health physics experience (junior or senior level) in commercial nuclear power plants, of which, a maximum of 50 hours per week may be accumulated in any single year. Related education, training and experience may be credited as defined below.
* Equivalent health physics technician experience for decontamination technician experience in commercial nuclear power plants may be credited at a rate of no more than 0.5 hours/hour worked up to a maximum of 1000 hours credit
* A Navy ELT qualification is equivalent to 5000 hours of commercial health physics technician experience
* Shipyard experience in health physics (108 qualification) is credited on a four hour basis up to a maximum of 5000 hours. Shipyard hours cannot be accumulated at a rate of more than 50 hours per week.
* An associate degree in a related technical field or a bachelors of science degree is equivalent to 2000 hours of commercial health physics technician experience.
* One year of training is equivalent to 500 academic hours
* Or completes the JR RPT program

Accountabilities:

* The Radiation Protection Technologist-Nuclear is responsible for performing and documenting the following:
* Area radiation surveys (beta and gamma)
* Area contamination surveys (fixed and smearable for beta, gamma and alpha)
* Area and breathing zone air sampling
* Area posting
* Radioactive material labeling
* Surveying, tagging and release of clean material from the Radiation Controlled Area (RCA)
* Job coverage in accordance with plant instructions and Radiation Work Permits
* Writing Radiation Work Permits
* Maintaining Radiological Emergency Plan equipment and supplies as well as the regular inventory of the material
* Providing support for the movement of Radioactive material within the RCA
* Implementation of the Respiratory Protection Program to include maintenance and issuance of the equipment
* Decontamination of contaminated personnel
* Issue, service, calibrate, and perform minor repairs on radiation detection instruments and equipment
* Responsible for shipping and receiving radioactive material and radioactive waste processing and shipping
* Perform surveys and documentation for receipt of new fuel and spent fuel handling and shipping
* Perform or direct decontamination activities
* Maintain health physics supplies inventory
* Monitor radioactive laundry so as to return to service
* Control of radiography operations
* The Radiation Protection Technologist reports to a Health Physics Supervisor or a General Maintenance Leader when working as a member of a Composite Crew

Required Qualifications

Technician Occup Sel Sys Test passed

Preferred Qualifications

Fork Lift Operator Certification
NRRPT Certification

NextEra Energy

Juno Beach, FL

NextEra Energy, Inc., through its subsidiaries, generates, transmits, distributes, and sells electric power to retail and wholesale customers in North America. The company generates electricity through wind, solar, nuclear, and natural gas-fired facilities. It also develops, constructs, and operates long-term contracted assets with a focus on renewable generation facilities, natural gas pipelines, and battery storage projects; and owns, develops, constructs, manages and operates electric generation facilities in wholesale energy markets.

As of December 31, 2018, the company operated approximately 24,500 megawatts of net generating capacity. It serves approximately 10 million people through approximately 5 million customer accounts in the east and lower west coasts of Florida with approximately 75,200 circuit miles of transmission and distribution lines and 645 substations. The company was formerly known as FPL Group, Inc. and changed its name to NextEra Energy, Inc. in 2010. NextEra Energy, Inc. was founded in 1925 and is headquartered in Juno Beach, Florida.